In the famously flat, windswept Fenland city of Cambridge, Pollard Thomas Edwards has built a hill. The Icon is a 106-home apartment building that tumbles down in boulder-like cubes towards a neighbouring cricket pitch.
PTE describes the form as “a lived-in architectural landscape”, and in many ways it is as much an outdoor space as a residential building. Each cube supports a 3m x 3m terrace, in addition to a shared roof garden the size of a city block. Circulation is via a tree-lined “street” that slices lengthways through the 100m-long plan like a canyon. The building acts as part of the landscape in more subtle ways too, with a rainwater strategy that exploits the structure’s distinctive topography and plugs into the neighbourhood’s wider SuDS network of swales and wetlands.
The Icon is the latest addition to Eddington, the University of Cambridge’s exemplar low-carbon development in the north-west of the city. It is essentially formed of two blocks on either side of the central street: the five-storey block on the west side of the street faces out onto one of the neighbourhood’s main squares and has a largely continuous elevation. The east block is the more dramatic, staggered form.
“The original idea was inspired by the inner courtyards of Cambridge colleges,” says Joanna Malitzki, associate at PTE. “The outer shape then reflects the different settings – the openness of the cricket field and the more urban side of the square.” The college buildings it evokes most strongly are the brutalist additions of the 1960s and 70s, particularly Denys Lasdun’s stepped precast-concrete terraces at New Court, Christ’s College. The Icon might not be exactly brutalist, but it’s certainly punchy amid Eddington’s polite brick townhouses and mid-rise apartment buildings.
The long, asymmetrical form curves at one end, generating more than 40 different apartment layouts that range from one to three bedrooms. This required a bespoke structural solution, as the irregular floorplates and loads change from one level to the next. The concrete frame is based mainly on 225mm-deep flat slabs, but each floorplate incorporates upstand beams of various depths and more than 15 column types.
“We designed every single column for its own loads,” says Balazs Bicsak, partner at structural engineer Price & Myers. “We were also able to refine the reinforcement, and even the slab thicknesses where the loads were potentially different.” Concrete with 50-75% GGBS was specified throughout the structure, although 25% was used in some areas when the programme required faster striking times.
Price & Myers also rationalised the substructure design. Instead of conventional piling, the engineers developed a raft solution, minimising the amount of excavation and structural materials needed. The ground-floor slab needed to be a substantial structure – up to 1.2m deep – in order to transfer the loads from the apartment buildings over the basement car and cycle park. The depth of the basement was minimised by coordinating elements such as tree pits and services within the structural layer.
The terraces are deceptively complex structures. Dropped slabs were used to create level thresholds between indoor and outdoor space, diagonal 1:40 falls were cast in, and upstand beams were added to support the door frames, as the full-width openings left no space for lintels.
Then there was rain: how exactly do you channel water down a facade that steps in and out and has no continuous vertical surfaces? “That was a really interesting challenge,” says Joanna Malitzki, associate at PTE, explaining how a network of boxpipes was integrated into the brick outer leaf. “It required a lot of technical coordination of the outlets because we had to penetrate the concrete upstands in a precise location in order to connect to the brick module.”
The concealed drainage is just one cog in an enormous rainwater harvesting machine. The brown and green roof areas slow the release of rainwater, and the courtyard has a central rill that channels water directly into a large attenuation tank in the basement, which in turn is linked to surrounding swales, lakes and detention basins. Eddington is claimed to have the largest site-wide water recycling and attenuation system in the UK, part of a strategy to reduce residents’ water use from 150l to 80l a day.
The neighbourhood’s masterplan also stipulated low-carbon operation, with all of the first phases of housing, including the Icon, designed to meet level 5 of the Code for Sustainable Homes. All flats are dual aspect, triple-glazed and highly insulated. They connect to a district-wide energy centre, partly supplied by a photovoltaic array on top of the west block that includes more than 500 panels.